logo
Send Message
Wuxi Zhongxin Special Steel Co.,Ltd.
products
products
Home > products > Oriented Silicon Steel > 23ZH100 27 ZH95 Electrical Steel Coil 27ZH110 Baosteel with-low-iron-loss

23ZH100 27 ZH95 Electrical Steel Coil 27ZH110 Baosteel with-low-iron-loss

Product Details

Place of Origin: CHINA

Brand Name: BAOSTEEL.ANSTEEL

Certification: ISO,CE,SGS

Model Number: 30Q120

Payment & Shipping Terms

Minimum Order Quantity: 1Ton

Price: USD600-USD4000/Ton

Packaging Details: Standard seaworthy export packing or as customer demands

Delivery Time: 7-15 Days

Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability: 8000 Tons per Month

Get Best Price
Highlight:

silicon iron SPCC Electrical Steel Coil

,

SPCC 3mm Electrical Steel Coil

,

610mm Electrical Steel Coil

Type:
Oriented Silicon Steel
Grade:
Silicon Iron Alloy
Shape:
Steel Coil/sheet/strip
Application:
Transformer Core
Processing Service:
Bending, Cutting
Length:
Customer Request
Thickness:
0.23mm To 0.5mm
Type:
Oriented Silicon Steel
Grade:
Silicon Iron Alloy
Shape:
Steel Coil/sheet/strip
Application:
Transformer Core
Processing Service:
Bending, Cutting
Length:
Customer Request
Thickness:
0.23mm To 0.5mm
23ZH100 27 ZH95 Electrical Steel Coil 27ZH110 Baosteel with-low-iron-loss

23ZH100 27 ZH95 27ZH100 27ZH110 Electrical Steel Coil SPCC & DC011.2mm 0.15 3mm thickness 508 610mm
 
Is laminated steel also called silicon steel?
Electrical steel, also called lamination steel, silicon electrical steel, silicon steel or transformer steel, is a material used to produce certain magnetic cores, such as stators and rotors in transformers and motors.
 
Why is silicon steel lamination used?
Silicon steel used in lamination mainly reduces Hysteresis loss,Eddy current losses,Copper loss. In order to minimize the eddy currents more,magnetic core is laminated . The hysteresis coefficient of silicon steel is less, so hysteresis loss can be reduced.

 

23ZH100 27 ZH95 Electrical Steel Coil 27ZH110  Baosteel with-low-iron-loss 0

Product NameElectrical Steel, Lamination Steel, Silicon Electrical Steel, Silicon Steel, Relay Steel, Transformer Steel
CategoryGrain-Oriented Electrical Steel; Non-oriented electrical steel
StandardAISI, ASTM, BS, DIN, GB, JIS, EN
Thickness0.2- 0.8 mm
Width900-1230mm
BrandBao steel
OriginChina
PackingExport standard package (as per requirements)
Payment Terms30% T/T in advance as deposit,70% balance against the B/L copy or 100% irrevocable L/C at sight
MOQ3 tons per size
Delivery time7-10 days after receiving L/C or deposit
Loading PortShanghai , China (any port in China )
RemarkSpecific requirement of alloy grade,temper or specification can be discussed at your request

 
23ZH100 27 ZH95 Electrical Steel Coil 27ZH110  Baosteel with-low-iron-loss 1
23ZH100 27 ZH95 Electrical Steel Coil 27ZH110  Baosteel with-low-iron-loss 2

23ZH100 27 ZH95 Electrical Steel Coil 27ZH110  Baosteel with-low-iron-loss 3

23ZH100 27 ZH95 Electrical Steel Coil 27ZH110  Baosteel with-low-iron-loss 4

Testing equipment
23ZH100 27 ZH95 Electrical Steel Coil 27ZH110  Baosteel with-low-iron-loss 5
Customer Visiting
 
23ZH100 27 ZH95 Electrical Steel Coil 27ZH110  Baosteel with-low-iron-loss 623ZH100 27 ZH95 Electrical Steel Coil 27ZH110  Baosteel with-low-iron-loss 7
 

General Q and A Questions

Q: Would you provide samples For free?
A: Yes . with on stock specification We provide samples For Free . Freight charge collect

Q:What information should i provide to source for the right products ?
A: Material grade, width, thickness, coating and Purchase quantity , Expected lead time ,etc
Q: What are the shipping ports?

A: Under normal circumstances, we ship from Shanghai, Tianjin, Qingdao, Ningbo ports, you

can choose other ports according to your needs.

Q: About product prices?
A: Prices vary from period to period due to cyclical changes in the price of raw materials.
Q: How long does your delivery time take?
A: In general, our delivery time is within 5-45 days, and may be delayed if the demand is extremely
large or special circumstances occur.
Q: Can I visit your location?
A: Of course, we welcome customers from all over the world to visit our factory. However, some
of the plants are not open to the public.
Q: Does the product have quality inspection before loading?
A: Of course, all our products are strictly tested for quality before packaging, and unqualified
products will be destroyed.We provide All original Mill test certificate and support third party inspection.
Q: How to pack the products?
A: The inner layer has a waterproof paper outer layer with iron packaging and is fixed with a fumigation
wooden pallet. It can effectively protect products from corrosion during ocean transportation.
Q: What is your working time?
A: In general, our online service time is Beijing time: 8:00-22:00, after 22:00,
we will reply to your inquiry during the next working day.